Estimates

Build a priced, versioned estimate with a full rate build-up, then push it straight through to the project budget and cost assignments.

Who it is for. Estimators who need their rate build-ups to flow into the project budget without retyping, and enterprise PMOs who need an AACE class and revision chain for stage-gate review.

What it is for

Capital-project estimates are almost always built in spreadsheets, then re-keyed into the cost system as a budget — and the two drift apart the moment either changes. This keeps the build-up and the resulting budget in one place, and pushes line items into cost assignments without creating duplicates if it is run again, so the estimate is the budget rather than a document that preceded it.

Why it matters

Rate build-ups, AACE classes, markups, cash-flow phasing and the push into schedule cost assignments stay together in one application. The estimate feeds the budget directly, while linked revisions preserve the history behind each approval.

EstimatesIllustrative
A composed unit rate, the markup build-up, and one button that makes it the budget.

What it does

Every line below is in the product today.

  • The full markup ladder

    Direct cost through escalation, contingency, overhead and profit, with overhead and profit distributed pro-rata back onto each line so burdened line totals sum to the estimate total.

  • AACE 18R-97 estimate classes

    Class 5 through Class 1, each carrying its published accuracy range and applying it to the total.

  • Unit rates you can defend

    Each line opens a build-up sheet — labour, equipment, material, subcontract, other — whose sum becomes the unit rate. A rate is a composition, not a number someone typed.

  • A real formula engine in the sheet

    Excel-style formulas with a formula bar, cell and column references, and a drag fill handle that shifts relative row references the way a spreadsheet does.

  • Custom columns that feed the estimate

    Define your own columns with formulas, number or currency formats and footer aggregates, then bind one to feed quantity or rate.

  • Revisions, and an approval that supersedes

    New Revision clones the header and every line, build-ups and phasing included, linked back to its source. Approving one automatically supersedes other approved estimates on the project.

  • Push to budget, twice, safely

    Line items become planned cost assignments in burdened or direct-only mode — and, wherever a resource and activity are named on the line, planned resource hours too. Re-running the push does not duplicate either.

  • Cash flow from the estimate itself

    Per-line distribution curves — linear, S-curve, front or back loaded, or custom weights — drive a weekly, monthly or quarterly cash-flow view with a cumulative row.

See it on your own schedule.

Send an XER before the call and we will import it and show you Estimates running against your data.