See the logic instead of the bars — an activity-on-node diagram in four layouts with the critical path highlighted and float on every card.

Who it is for. Planners finding the missing link or the wrong driver, and anyone defending a sequence in a review meeting.

What it is for

A Gantt hides logic behind bars; you can stare at a slipping schedule for an hour without seeing that the driver is two activities upstream. Planners fall back to whiteboards or a diagramming tool.

Against the incumbents

Modest, and worth stating modestly: a time-scaled logic diagram and a WBS-blocked one are not layouts P6 or MS Project offer, and baseline-slip on node cards is unusual. This is a viewer, not an analysis engine.

Network
The network view. Critical path highlighted, float on every node.

What it does

Every line below is in the product today.

  • Four layouts

    Tree, timeline, circle and WBS blocks, switchable from the toolbar and the ribbon.

  • Float on every card

    Activity code, a critical badge, name, start and finish, and total and free float in days.

  • Baseline slip on the node

    Pick a baseline and every card grows baseline dates plus a colour-coded finish-slip badge.

  • A time-scaled logic diagram

    Timeline layout positions nodes by start date with predecessor-aware lane packing — not a layout P6’s Activity Network offers.

  • Tree layout that minimises crossings

    Ranks by longest predecessor chain, then orders within each level by barycenter.

  • Critical only

    Strip every non-critical node and its edges out of the graph in one click.