Guides
The questions planners search for, answered properly.
Reference pages on the file formats, assessments and methods that project controls work runs on. Written from the way the product actually implements them, so the detail holds up.
Explainers
- Explainer
What is an XER file, and how do you open one without Primavera P6?
An XER file is Primavera P6’s tab-delimited project export. What it contains, how durations and calendars are stored, and how to open or convert one.
- Reference
The DCMA 14-point schedule assessment, check by check
Every check in the DCMA 14-point schedule assessment with its standard threshold, the CPLI and BEI formulas with worked examples, and how to fix common failures.
- Explainer
Forensic delay analysis: the methods, what each one needs, and how to choose
Forensic delay analysis methods in AACE 29R-03: as-planned vs as-built, windows analysis, impacted as-planned, time impact analysis and collapsed as-built.
See it on your own schedule.
Send an XER before the call and we will import it, run the DCMA assessment against it and walk through the result with you.